Scheduled maintenance for South Science network 4-17-19

OIT staff need to perform a scheduled reboot of one of our network distribution switches. This work will be done between 7:00am and 7:30am on Wednesday, April 17th. The reboot should take less than 10 minutes.

The following buildings will lose networked services during this 10 minute reboot:

South Science
Lambert
Pond (Hewat)