OIT will be hard at work over the Winter Shutdown performing maintenance and upgrades to prepare for the new year. We have scheduled this to impact the fewest people.
Wednesday, December 27th
From 3:00 PM to approximately 09:00 PM we will upgrade edge switches in half of campus buildings (North of Route 2). This will require each switch to be offline for approximately 20 minutes. During this time, there will be no network (wired and wireless) in the building, so all computers, access points, phones and POE locks will be off line.
This will impact the following buildings (times are approximate):
Building | Start | End |
Chaffee Tennis House | 3:00pm | 3:30pm |
Facilities Maintenance Building | 3:00pm | 3:30pm |
Mission Park | 3:00pm | 3:30pm |
Poker Flats | 3:00pm | 3:30pm |
Thompson Hall | 3:00pm | 3:30pm |
Bryant House | 3:30pm | 4:00pm |
Carter House | 3:30pm | 4:00pm |
Gladden House | 3:30pm | 4:00pm |
Mark Hopkins House | 3:30pm | 4:00pm |
Woodbridge House | 3:30pm | 4:00pm |
Dodd House | 4:00pm | 4:30pm |
Goodrich House | 4:00pm | 4:30pm |
Hubbell House | 4:00pm | 4:30pm |
James Pratt Bike Shed | 4:00pm | 4:30pm |
Lehman Hall | 4:00pm | 4:30pm |
Parsons House | 4:00pm | 4:30pm |
Sewall House | 4:00pm | 4:30pm |
Tyler Annex | 4:00pm | 4:30pm |
Tyler House | 4:00pm | 4:30pm |
Stetson-Sawyer Library | 4:30pm | 5:00pm |
62 Center for Theatre & Dance | 5:00pm | 5:30pm |
Children’s Center | 5:00pm | 5:30pm |
Chiller Plant | 5:00pm | 5:30pm |
Class of 37 House | 5:00pm | 5:30pm |
Droppers House | 5:00pm | 5:30pm |
Faculty House | 5:00pm | 5:30pm |
Greylock Dining Hall | 5:00pm | 5:30pm |
Dodd Annex | 6:30pm | 7:00pm |
Griffin Hall | 6:30pm | 7:00pm |
Hollander Hall | 6:30pm | 7:00pm |
Kellogg House | 6:30pm | 7:00pm |
Mason House | 6:30pm | 7:00pm |
Sage Hall | 6:30pm | 7:00pm |
Thompson Memorial Chapel | 6:30pm | 7:00pm |
Williams Hall | 6:30pm | 7:00pm |
Hopkins Hall | 7:00pm | 7:30pm |
Schapiro Hall | 7:00pm | 7:30pm |
Bernhard Music Center | 7:30pm | 8:00pm |
Paresky Center | 7:30pm | 8:00pm |
Thursday, December 28th
From 3:00 PM to approximately 09:00 PM we will upgrade edge switches in half of campus buildings (South of Route 2). This will require each switch to be offline for approximately 20 minutes. During this time, there will be no network (wired and wireless) in the building, so all computers, access points, phones and POE locks will be off line.
NOTE: Thompson Chemistry Lab will have two outages on this day, one for an hour between 5:00pm and 6:00 pm and the other between 7:30 pm and 8:00 pm.
This will impact the following buildings (times are approximate):
Building | Start | End |
Agard House | 3:00pm | 3:30pm |
Chadbourne House | 3:00pm | 3:30pm |
Fort Bradshaw | 3:00pm | 3:30pm |
Garfield House | 3:00pm | 3:30pm |
Horn Hall | 3:00pm | 3:30pm |
Milham House | 3:00pm | 3:30pm |
Perry House | 3:00pm | 3:30pm |
Wood House | 3:00pm | 3:30pm |
Currier Hall | 3:30pm | 4:00pm |
Doughty House | 3:30pm | 4:00pm |
East College | 3:30pm | 4:00pm |
Fayerweather Hall | 3:30pm | 4:00pm |
Fitch House | 3:30pm | 4:00pm |
Morgan Hall | 3:30pm | 4:00pm |
Prospect House | 3:30pm | 4:00pm |
Spencer House | 3:30pm | 4:00pm |
Susan B. Hopkins House | 3:30pm | 4:00pm |
The Log | 3:30pm | 4:00pm |
West College | 3:30pm | 4:00pm |
57 Spring St. | 4:00pm | 4:30pm |
63 Spring St. | 4:00pm | 4:30pm |
63 Spring St. | 4:00pm | 4:30pm |
B&L Building | 4:00pm | 4:30pm |
Lawrence Hall | 4:00pm | 4:30pm |
Pond House | 4:00pm | 4:30pm |
Thompson Health Services | 4:00pm | 4:30pm |
ABC House | 4:30pm | 5:00pm |
Bascom House | 4:30pm | 5:00pm |
Brinsmade House | 4:30pm | 5:00pm |
Brooks House | 4:30pm | 5:00pm |
Grundy’s Garage | 4:30pm | 5:00pm |
Jewish Religious Center | 4:30pm | 5:00pm |
Miller House | 4:30pm | 5:00pm |
Driscoll Dining Hall | 6:30pm | 7:00pm |
Lansing Chapman Rink | 6:30pm | 7:00pm |
Oakley Center | 6:30pm | 7:00pm |
Service Building | 6:30pm | 7:00pm |
Spencer Studio Art Building | 6:30pm | 7:00pm |
Weston Field Grandstands | 6:30pm | 7:00pm |
Weston Team Center | 6:30pm | 7:00pm |
38 Spring St. | 7:00pm | 7:30pm |
Chandler Athletic Center | 7:00pm | 7:30pm |
Chandler Commercial Space | 7:00pm | 7:30pm |
Goodrich Hall | 7:00pm | 7:30pm |
Hopkins Observatory | 7:00pm | 7:30pm |
Lasell Gymnasium | 7:00pm | 7:30pm |
Smith-Rudnick Building | 7:00pm | 7:30pm |
Bookstore | 7:30pm | 8:00pm |
Clark Hall | 7:30pm | 8:00pm |
Morley Science Labs | 7:30pm | 8:00pm |
Schow Science Library | 7:30pm | 8:00pm |
Thompson Biology Lab | 7:30pm | 8:00pm |
Thompson Chemistry Lab | 7:30pm | 8:00pm |
Thompson Physics Lab | 7:30pm | 8:00pm |
Hopper Science Center | 8:00pm | 8:30pm |
Wachenheim Science Center | 8:00pm | 8:30pm |
Date to be Determined
The following buildings will be scheduled separately (once schedule is known they will be updated)
- Jesup Hall – Completed 12/11/2023 between 7:30pm and 7:45pm
- Mears – Completed on 12/19/2023 between 9:00pm and 9:20pm
- Mears West – Completed on 12/19/2023 between 9:00pm and 9:20pm
- Vogt – Completed on 12/19/2023 between 9:00pm and 9:20pm
- Sears – Completed on 12/19/2023 between 9:00pm and 9:20pm
- Weston Hall – Completed on 12/20/2023 between 9:00pm and 9:20pm
- CDE Residence – Completed on 12/20/2023 between 9:00pm and 9:20pm
- St Anthony Hall – Completed on 12/20/2023 between 9:00pm and 9:20pm
- Library Shelving
- President’s House
- Rosenburg
Other maintenance activities will be done in addition to those listed above, which will cause no disruptions to the general community. Any that may cause any disruptions specific to certain departments have been coordinated directly with those departments.
This work will NOT affect access to email, calendar, drive or other G-Suite apps (Google Apps for Education) from off-campus.
We do this to help get ready for the upcoming semester and to make sure everything is working well for our community. As always, if this poses an issue for you or your department please contact me as soon as possible, we will help reduce the impact on your work. Thank you,
– Edward Nowlan